Got called to a bathroom in Bristol last week
Brand new tiles. Looked beautiful. But water was coming through the ceiling below. The last tiler had tiled straight over a slow leak. Didn't check the pipes first. We had to take half the new tiles off to fix a £15 fitting. That's why I do both jobs. Pipes first, test it, then tile. Done once, done right. If your bathroom is getting done, make sure the plumbing is sorted before the tiling starts.
Edited 12d ago
0 comments

0 Comments
Join the conversation
Sign in to leave a comment.